Six capabilities, one platform, built for SyteLine
Each product is what it contributes to the floor, not a separate purchase. Your tier includes a license for each of its products, with starter quantities included, and you install what you need. Shop-Trak, Doc-Trak and Fact-Trak already work on your SyteLine data today. The next direct product-to-product integration, Shop-Trak and Machine-Trak, is expected by the end of 2026, with more through 2027.

How the components fit together
1. Scrap becomes a case, by itself
In developmentA scrap entry at the operation raises the disposition, with the job, the operator, the machine state and the documents already attached. Nobody opens a second system and retypes the context. In development.
2. Machines open their own tickets
PlannedThe machine detects the condition and Quality-Trak runs the response workflow, so detection and response stop being connected by a person who has other work. Planned.
3. Quality forms, document enabled
Planned 2027Inspection records, certificates and change documents file themselves against the same job record, which is where an auditor looks rather than where somebody filed it. Doc-Trak and Quality-Trak together, planned 2027.
4. Cost of quality meets job cost
PlannedQuality cost joins labor and machine cost on one job. This is the number the business runs on, and it is the one no single product can produce. Cost of quality on the job follows the machine link; planned.
Click any component to open its page. The lower half of each card is the design rule: what it captures, and the workflow layer that acts on the capture.

Shop-Trak
Labor, quantities and scrap at the operation, posted into SyteLine as the work happens. Visual Dispatch on the floor; Mobile in a browser.
The full Shop-Trak pageBrochure (PDF)
Doc-Trak
Packing slips, certificates, labels and work instructions produced from SyteLine and delivered where they are needed, working with the repositories you already have.
The full Doc-Trak pageBrochure (PDF)
Machine-Trak
Any asset, connected: CNC, PLC-based or legacy. OEE and utilization first, then downtime reasons, with drill-down that answers why. Connections may require a setup fee.
The full Machine-Trak pageBrochure (PDF)
Quality-Trak
Nonconformance and corrective action, engineering change, audits and inspections at the operation, inside SyteLine. Sold as part of the platform; SyteLine 9 and later.
The full Quality-Trak pageBrochure (PDF)
Fact-Trak
Analytics and planning on your SyteLine data: actuals against standard by job and work center. Part of the Pro tier.
The full Fact-Trak pageBrochure (PDF)
Vantage
Role-based views of the whole plant: late jobs, quiet work centers, machine state and attainment in one place. Included in every tier.
See VantageShop-Trak, Doc-Trak and Fact-Trak work on your SyteLine data today, and Quality-Trak runs inside SyteLine. We connect them further with every release. Doc-Trak and Shop-Trak already share the job; the Shop-Trak and Machine-Trak job link is expected in 2026.
The intelligence layer
Platform-wide AI planned 2027Doc-Trak's Search or Ask AI and AI summaries are available now. AI across the platform that flags jobs at risk of going late and cost drifting from standard is planned 2027, with a person deciding. The intelligence layer in full