The Lake MES Platform
The Lake MES Platform · Quality-Trak
Quality and change management, inside Infor SyteLine

Quality runs on paper, email and memory. The ERP can't see it.

Quality-Trak runs nonconformance, corrective action, engineering change and inspection inside Infor CloudSuite Industrial (SyteLine), on the same database as the job. Not a system beside the ERP. Part of the Lake MES Platform.

A machinist measuring a turned part with a micrometer
Built for SyteLine only: Built on Infor Mongoose and runs inside SyteLine, on the same database as the job. SyteLine 9 and later. Built and supported by The Lake Companies.

What changes

What we hear from quality leaders

Six versions of the same problem, in almost every plant we walk into. Here is what each one looks like with Quality-Trak. The goal underneath all six: catch it at the operation, not the dock, and prove it from the record.

Today

Paper and spreadsheets

Inspection sheets and NCRs live in binders and a folder called "Quality FINAL v3."

With Quality-Trak

One system, inside the ERP

Nonconformance, corrective action, deviations and complaints run inside CloudSuite Industrial, on the same database as the job.

Today

Email is the workflow

Dispositions and approvals travel by inbox. Nobody can see which parts are on hold.

With Quality-Trak

The Workbench is the workflow

Every open NCR shows its owner and its due date. User-defined workflows carry a disposition from raised to closed without an inbox.

Today

Audits are projects

Every audit means days of pulling records by hand, and hoping the binder is complete.

With Quality-Trak

The audit is pulled from the system

Audits are run and recorded in the system, so the next one starts from the record rather than from a search.

Today

Changes arrive late

An engineering change reaches the floor after the old revision has already run.

With Quality-Trak

One controlled path from request to release

Engineering change and new product introduction run on a single path, and every change stays on record for the next build.

Today

No linkages

Quality data sits beside the ERP, not in it, so it never ties back to the job or the work order.

With Quality-Trak

On the job record by design

Quality-Trak shares the CloudSuite Industrial database and inherits SyteLine's security model. There is no middleware to host or reconcile.

Today

Cost of quality is invisible

Scrap and rework show up as unexplained variance at month-end, long after the job closed.

With Quality-Trak

Cost of quality, captured today

Cost of quality is recorded on the nonconformance, corrective action and change records, as an amount, a level or time by team, and analyzed by Pareto. Cost of quality on the open job, beside labor and machine cost, is next.

“Can we prove these parts were good? Certs live on a whiteboard, audits take two weeks.”

The question every quality manager answers under pressure. A quality record that sits on the job, not in a binder, is where the answer starts.

“We quoted 30% margin and delivered 28. Where did the two points go?”

The question every controller asks. Scrap and rework are where a meaningful share of those points go.

What your team gets, role by role

Quality manager

Opens the Workbench: every open NCR with its owner and due date, and a Pareto that is already current.

Inspector and operator

Records dimensional, torque, checklist and attribute results in the system. A failed first piece holds the job.

Engineer and document control

Releases the change once, on one controlled path from request through to release.

Plant manager

Sees holds and quality trends from the record instead of hearing about them in the morning meeting.

Quality-Trak

Catch it at the operation, not the dock.

Quality-Trak is built on Infor Mongoose and runs inside CloudSuite Industrial, sharing its database and its security model. It is part of the Lake MES Platform and is not sold on its own. Nothing extra to host, sync or maintain.

Quality management

  • Nonconformance (NCR) and corrective action (CAPA)
  • Deviations and customer complaints
  • Audits run and recorded in the system

Change management

  • Engineering change (ECO) and new product introduction (NPI)
  • One controlled path from request to release
  • Every change on record for the next build

Production and inspection

  • Dimensional, torque, checklist, attribute and serial inspections
  • First-piece lock: the job waits for a good first part

Quality Workbench Pareto analytics User-defined workflows

Quality-Trak runs on SyteLine 9 and later, on premises or in Infor's multi-tenant cloud, and is sold only as part of the Lake MES Platform. Your account team confirms what your version supports. Quality-Trak does not include gage calibration. How activation works.

Point solution or platform

The quality fix is the same size either way.

Only one of them makes the next fix smaller. Buy a quality tool and you fix the forms. Then you build and maintain every link to the job, the floor and the documents yourself. Quality-Trak runs inside the ERP, as part of the platform, so the next capability is a switch rather than a project.

A standalone quality toolThe Lake MES Platform, starting with Quality-Trak
Where quality data livesIts own database, beside SyteLineInside SyteLine, on the CloudSuite Industrial database
Tie to the jobAn integration you build and maintainOn the job record by design
MiddlewareSomething to host, sync and maintainNone
Documents and revisionsA separate systemDoc-Trak, on the same platform
Machine contextOut of scopeMachine-Trak, on any asset
SyteLine upgradesRetest the integration every timeEach SyteLine release is tested by Lake, then the platform release follows
The next capabilityNew vendor, new projectSwitch it on
ContractsOne more contract and renewalOne subscription, one renewal

You are buying one-off solutions and becoming a systems integrator yourself to create what we give you off the shelf.

On the platform

Quality-Trak on the Lake MES Platform

Quality doesn't live alone. On the platform, it doesn't have to. Shop-Trak, Doc-Trak and Fact-Trak already work on your SyteLine data today. The next direct product-to-product integration, Shop-Trak and Machine-Trak, is expected by the end of 2026, with more through 2027.

Shop-Trak

Planned 2027

Labor, quantities and scrap recorded at the operation, on the same SyteLine job your quality records sit on. Recording quality transactions in the Shop-Trak window is planned for 2027.

Doc-Trak

Available Now

The drawing, work instruction and certificate attached to the job travel with it, so the floor builds from the job's own documents.

Machine-Trak

Available Now

Any asset reports run, idle and down: the context behind a quality problem. Start with OEE and utilization. The job link to Shop-Trak is expected by the end of 2026.

Fact-Trak

Planned

Job cost and margin analytics on your SyteLine data. Cost of quality on the job view follows. Part of the Pro tier.

Vantage

Expected Early 2027

Quality KPIs beside labor, machine and delivery on one role-based command center. Drilling into the detail needs a Quality-Trak seat.

Intelligence

Planned 2027

AI across the platform flags risk before it becomes a late job. A person decides.

Your platform journey

Start with quality. Keep climbing.

Capacity scales, capability activates. Starter quantities of every product are included in every tier, so each stage starts as a pilot, not a purchase.

1

Quality on one system

Available Now

NCRs, corrective action, changes and controlled documents move off paper and into CloudSuite Industrial.

2

Quality at the operation

Available Now

Inspections are recorded where the work happens. First-piece lock holds the job until there is a good part.

3

Connect the machines

Available Now

Start with the machine included in your platform: OEE and utilization first, then downtime reasons, on any asset.

4

Run the plant from one screen

Expected Early 2027

Holds, late jobs and quality trends in one role-based command center, with cost of quality on the job.

Only a platform can do this

What the job record makes possible

Scrap becomes a quality case by itself

In Development

A scrap entry at the station opens the quality record.

Certification gates the clock-in

Available Now with Shop-Trak

Only a qualified operator starts the operation, through the work center skills check.

A machine fault raises the quality case

Planned

Drift at the machine opens the quality record by itself.

Questions manufacturers ask

What we hear about Quality-Trak, and what we say back

Each one is a problem in a manufacturer's words. The answer names what Quality-Trak does about it today, what is still coming, and where the problem sits in the 49 we have catalogued.

Quality lives in Word and Excel, nowhere near the job.

Quality-Trak runs nonconformance, corrective action, audits and inspections inside SyteLine, on the same database and the same work order as the labor. Built on Infor Mongoose, so it is a SyteLine form, not a separate system. Available now.

In the book of painQuality lives in spreadsheets, disconnected from the floor Available now

Scrap shows up in a report after the job has shipped.

Scrap and yield are visible in real time with drill-through to the source transaction, and with Quality-Trak in place the catch moves upstream to the operation that created it. The step beyond that, where a scrap entry at the station opens the quality record by itself, is in development.

In the book of painScrap and yield are not visible until it is too late Available nowEngineering changes and holds do not reach the operation Available now

Our operators will not open a nonconformance for every small problem, so the small problems never get recorded.

They do not have to. An operator reports a problem from the job without opening a nonconformance, and a supervisor or quality engineer decides whether it escalates to an NCR. The light path captures what the heavy path would have lost, and the heavy path stays reserved for what deserves it. Available now.

In the book of painQuality lives in spreadsheets, disconnected from the floor Available nowScrap and yield are not visible until it is too late Available now

Engineering changes and holds do not reach the operator.

Engineering change runs in two phases inside SyteLine. First, request and review: anyone can submit a request, and engineering reviews impact and cost, then approves it, rejects it, or redirects it to a nonconformance or a corrective action. Second, execution: an approved request becomes the ECO and runs as a task list through to verification. A hold sits on the job record, and through Doc-Trak the current revision is what the operator opens at the station. Available now.

In the book of painEngineering changes and holds do not reach the operation Available nowThe wrong revision is on your shop floor right now Available now

A customer asks whether a part we made eight months ago was good, and proving it is archaeology.

The inspection is recorded on the work order, the cert is scanned to the lot at receiving, and the view log says who saw the instruction. Dimensional, torque, checklist, attribute and serial inspections and first-piece lock are all on the job. Inspection characteristics are defined by item, product family or work center rather than by operation number, so they survive a routing change and work on routings built by a configurator. Available now.

In the book of painCan we prove these parts were good? Available nowAn audit means digging for the file you cannot find Available now

We need to know what poor quality is costing us, job by job.

Cost of quality is captured today: it is recorded on the nonconformance, corrective action and change records, as an amount, a level from your own code list, or time by team, and analyzed by Pareto. Base SyteLine has no place for a defect and its cost. Cost of quality on the open job, joining labor and machine cost on the same record, is planned.

In the book of painNobody can combine labor, machine and quality into job profitability Planned

Can quality alert us when a machine drifts out of bounds?

Machine-Trak alerts on the condition today. A machine fault or drift that opens the quality record by itself is planned, with no date.

In the book of painThere is no alert when quality goes out of bounds Planned

Safety and environmental records: is that another system?

Environmental, health and safety records on the same engine as quality, so there is one compliance surface rather than another silo, is planned, with no date.

In the book of painSafety and environmental records without another silo Planned

What does Quality-Trak need, and can we buy it on its own?

Quality-Trak runs on SyteLine 9 and later, on premises or in Infor's multi-tenant cloud, and is sold only as part of the Lake MES Platform. Every tier is entitled to it, and you decide what to install. Your account team confirms what your version supports.

In the book of painYou have become your own systems integrator Available now

All Quality-Trak problems in the book of pain

How you buy it

You buy the platform once. You grow it by switching on.

One subscription, one renewal

Your tier includes a license for each of its products, with starter quantities included, and you install what you need. One agreement covers all of it.

Capacity scales, capability activates

Add devices, users, seats or machines as you grow. New capability is switched on, not reinstalled. Machine-Trak connections may require a setup fee.

Care after go-live, included

Check-ins and activation help are part of the subscription. We'd rather come solve a real problem on your floor than run you through a demo.

Your account team sizes the platform with you and confirms the numbers in a written quote. Quality-Trak is part of the platform and is not sold on its own, so it arrives with the subscription you already hold.

Moving to Infor's multi-tenant cloud? Quality-Trak and the platform move with you. Your account team will confirm what your version supports.

Already a Lake customer? What your tier includes

Start with quality. Keep climbing.

SyteLine is your system of record. The Lake MES Platform is your system of execution.

Talk to a Quality-Trak expert: (920) 406-3030. We'd rather come solve a real problem on your floor than run you through a demo.